Before production, first check the "Mold Installation Instructions" to check whether the injection equipment conforms to the design. Check the mold perimeter,
Whether the thickness, positioning ring, sprue bushing, ejection hole distance and other data of the mold conform to the equipment used. And familiar with mold structure and
Note, confirm the mold hoisting direction and mark up.
According to the characteristics of the mold and equipment, the molder selects the mould clamp,
step block clamp set,
bolts and spacers, booster, positioning ring, wrench, etc.
According to the fixed management requirements, they are placed on the special tool cart and pushed to the specified area.
2.2.5 Technicians should check and clean up the ash and dirt of the injection molding motor, static mold seat plate and guide rail to make them clean and clean.
Motorized, static plate knocks, and bruises are handled smoothly, and the ejector rod arrangement of the injection molding machine is checked according to the mold shape. The rectangle should be given priority
The four ejector pins are arranged in line with the position of the ejector pin holes of the mold. Adjust the height of the ejector rod of the injection molding machine to make it consistent and fixed reliably.
The degree difference is controlled within ±0.1mm. In order to ensure the uniformity of the force when the product is ejected.